CN 222/01
Shenzhen Metro Opening Line 8 and Phase 3 of Line 2
30 rides from date of activation
Line 8, formerly known as Yantian line of the Shenzhen Metro, opened on October 28, 2020, with a length of 20.377 km and a total of 11 stations. It connects the eastern suburbs of Liantang to Yantian Road, then towards the beach resorts at Dameisha and Xiaomeisha
Categorie:
Maatschappij:
Shenzhen Metro Group Co. Ltd.
Serie:
Rapid Transit
Catalogus nummer:
Colnect codes CN-SZMC-METRO-006.01
Controle nummer:
04F570120D6680 031420103 813452199
Vervaldatum:
2022-11-19
Kaart systeem: